Every box.
Every job site.
Off the whiteboard
in your head.

Fifty-two steel containers, a truck, and a phone that never stops. Hauler replaces the mental map and the text-message dispatch with one board: where each bin sits, who has it, how many days it has been there, and what the haul actually earned once it came back and hit the scale.

DispatchTHU 23 JUL 202652 bins
▲ 2 jobs with no driver▲ 3 bins past their month▲ 5 ready to invoice
  • 30 ydRB-014
    Bergstrom Ridge Concrete4412 Riverside Dr
    On site
    12
    $500.00
  • 40 ydRB-002
    Lantana Building Co.219 Slaughter Ln
    Overdue
    47+3W
    $650.00
  • 30 ydRB-020
    Vela Concrete8800 Manchaca Rd
    Out for delivery
  • 40 ydRB-007
    Vega Roofing88 Pine Rd
    Pickup requested
    264D LEFT
    $500.00
31 on site · 17 in yard · 2 in transit · 2 in service
Where is it

Every container, live

Yard, job site, in transit or at the transfer station — with the day count that tells you which one to chase.

How long

The billable clock

Runs from delivery-confirmed to pickup-confirmed. Nothing is estimated and nothing is remembered.

What it made

Margin per haul

Revenue, driver payout and the disposal fee on the same line, so you know which hauls are worth taking.

Post-paid, from real numbers

The invoice is written
after the bin comes back.

Nobody is charged up front. The container goes out, sits on site, comes back, gets weighed and dumped — and only then is the order billed, from the real time on site and the real weight off the facility’s scale ticket. Every rate below is a configurable field on the container type, not a constant, and every order freezes the rate card it was created under.

$500.00BaseDelivery, pickup, disposal
30 daysIncludedThen $50 per started week
3.00 tonsIncludedThen $60 per started ton
Invoice INV-104252 D · 6.10 T
Base rental — 40 yd roll-offDelivery, pickup, disposal, 30 days on site, 3.00 ton allowance
1 × $500.00$500.00
Time overage — 22 days past 3052 days on site · ⌈22 ÷ 7⌉ = 4 weeks
4 × $50.00$200.00
Weight overage — 3.10 tons past 3.006.10 tons weighed · ⌈6,200 ÷ 2,000⌉ = 4 tons · ticket TS-448120
4 × $60.00$240.00
Invoice total$940.00
Priced with 40 yd config v3snapshotted 01 JUN 2026
A desk, a cab, and a contractor’s phone

One system, built three different ways

Twenty-four things a yard stops doing by hand — the board, the run sheet, the workshop, the phone that never stops, and the invoice that writes itself. With the screens that do them.

See what it solves

Stop running the yard from memory

Half an hour, your own numbers, and the board with your operation in it rather than a slide deck.